Dimension
Depth : 28'
Height : 19'
Width : 52'
Area
First Floor: 250 sq/ft height 9'
Garage: 926 sq/ft height 9'
* Total Square Footage typically only includes conditioned space and does not include garages, porches, bonus rooms, or decks.
Ceiling
Garage Ceiling : 9'
Main Ceiling : 9'
Upper Ceiling Ft : 9'
Roof
Primary Pitch : 6:12
Roof Framing : 2x6
Roof Load : 25
Roof Type : Truss
Exterior Wall Framing
Exterior Wall Finish : Siding/Shingle
Framing : 2"x6"
Additional Room Features
Outdoor Spaces
Code Compliance
Structural Information Provided
Foundation Drawing
Structural 1st Floor Framing
Structural Roof Framing
Rooms
Deck:
180 sq/ft width 10' x depth 18'
Garage:
823 sq/ft width 30' 6" x depth 27'
PDF Print Set:
$425.00
A non-modifiable, print only PDF file
5 Copy and PDF Set:
$514.25
5 printed plan sets mailed to you plus PDF plan sets are best for fast electronic delivery and inexpensive local printing.
PDF Master Set:
$803.25
An unlocked, modifiable PDF file
CAD Set:
$892.50
For use by design professionals to make substantial changes to your house plan and inexpensive local printing.
Master Builder Package:
$981.75
Includes CAD Set, PDF Masters and Unlimited Build License
Study Set:
$314.50
One electronic set for bidding purposes only. Not a legal building set for construction.
Right-Reading Reverse:
$68.00
Choose this option to reverse your plans and to have the text and dimensions readable.
Additional Construction Sets:
$21.25
Additional hard copies of the plan (can be ordered at the time of purchase and within 90 days of the purchase date).
Additional Use License:
$314.50
Allows you to build one more home for each additional license purchased.
Audio Video Design:
$140.25
Receive an overlay sheet with suggested placement of audio and video components.
Construction Guide:
$33.15
Educate yourself about basic building ideas with these four detailed diagrams that discuss electrical, plumbing, mechanical, and structural topics.
Lighting Design:
$140.25
Receive an overlay sheet with suggested placement of lighting fixtures.
* Alternate Foundations may take time to prepare.
** Options with a fee may take time to prepare. Please call to confirm.